Production drilling application

In production drilling substantial cost savings can be achieved. With just a couple of degrees hole deviation from the precalculated hole direction, the cost for drilling and blasting increases dramatically.
Features
* Shorter alignment time
* Less drillmeter/cubicmeter
* Lower consumption of explosives
* Lower consumption of drill bits and steels
* Increased safety
* Less overbreak
* Less round scalings
Collering fault
* 1 degree = 1,75 cm/m
* 1,5 degree = 2,62 cm/m
* 2,0 degree = 3,49 cm/m
* 2,5 degree = 4,37 cm/m
* 3,0 degree = 5,24 cm/m